Glebe Books

  • Removal of existing subfloor.

  • Dug and poured new footings for uni piers.

  • Installed LVLs as joist and bearers. The floor was laid on an angle as the extension concrete was 110mm higher.

  • Laid red tongue around columns.

Darlinghurst Catholic Health Care

  • Supply and install of Fatra membrane to two large areas of the roof.

  • Custom flashings around pipe details and penetrations.

Fairfax Road, Mosman

  • Tapered insulation.

  • Cut and laid tapered Kingspan Insulation to drawings.

  • Created hips and valleys for the water to correctly flow to the drains.

Bondi Junction

  • Removed over 40 tons of screed and liquid membrane installed by an existing builder.

  • Removed 5 courses of bricks from the wall due to rotting of the wall plate, causing brick collapse. 

  • Removed the existing concrete floor.

  • Cut timber wedges to increase the water fall to a box gutter.

  • Installed Watertight Right Fatra Membrane on top of 50mm insulation.