Glebe Books
-
Removal of existing subfloor.
-
Dug and poured new footings for uni piers.
-
Installed LVLs as joist and bearers. The floor was laid on an angle as the extension concrete was 110mm higher.
-
Laid red tongue around columns.
Darlinghurst Catholic Health Care
-
Supply and install of Fatra membrane to two large areas of the roof.
-
Custom flashings around pipe details and penetrations.
Fairfax Road, Mosman
-
Tapered insulation.
-
Cut and laid tapered Kingspan Insulation to drawings.
-
Created hips and valleys for the water to correctly flow to the drains.
Bondi Junction
-
Removed over 40 tons of screed and liquid membrane installed by an existing builder.
-
Removed 5 courses of bricks from the wall due to rotting of the wall plate, causing brick collapse.
-
Removed the existing concrete floor.
-
Cut timber wedges to increase the water fall to a box gutter.
-
Installed Watertight Right Fatra Membrane on top of 50mm insulation.